sample board exam questions for ALE Day 1 AM session on Professional Practice, which includes RA 9266, Code of Ethics, SPP Docs 201-209, General Conditions, Contract Documents, Specifications, Project Scheduling, Global Practice
1. CLIENT HIRES ARCHITECT DELA CRUZ IN DESIGN-BUILD BY ADMINISTRATION PROJECT OF A REST HOUSE BUNGALOW LOCATED IN THE MOUNTAINSIDE, 60 KM AWAY FROM THE MUNICIPAL HALL. ARCHITECT DELA CRUZ PREPARED HIS TEAM AND STARTED WORKING ON THE PROJECT IMMEDIATELY. How much is the mobilization fee to be made by the Client to Arch. Dela Cruz upon signing of the service agreement? 2. Who will apply for a building permit on this project? 3. How much total recommended professional fee the architect is entitled? 4. Under the Design-Build on guaranteed maximum cost, if the actual cost exceeds by more than 10% of estimated construction cost, the excess amount shall be shouldered by whom? 5. All receipts under Design-Build Project shall be under the name of whom? 6. Who keeps the record of the project? 7. Any dispute between the Client and the Architect under the Design-Build Agreement should be settled initially through _____? 8. For monetary claims and disputes less than One Hundred Thousand Pesos, the process of collection should be initially through: 9. If in any case a claim undergoes mediation/conciliation, how many days should both parties comply with the arbitration order? 10. In settling disputes by arbitration through mediation/conciliation, the arbitration committee members should be composed of one representative each by both parties and the other should be: 11. In relation to the architect’s responsibility to the client, which among the choices should the architect not heed? 12. In preparation of the contract documents, the architect should always consider and include in the contract the following provisions except one: 13. APPRENTICE JOSE AND MARIA ARE EMPLOYED UNDER XYZ ARCHITECTURAL FIRM, HEADED BY ARCHITECT SANTOS. APPRENTICE JOSE WAS CAUGHT BY MARIA GETTING THE SOFT COPIES OF THE PROJECT THEY ARE WORKING ON THROUGH A USB DRIVE. JOSE ARGUE THAT THERE IS NOTHING ILLEGAL SINCE THEY ARE THE ONE WORKING ON THE DOCUMENTS EVEN WITHOUT THE CONSENT OF THEIR BOSS. Is the action of Apprentice Jose illegal? 14. What should be the action of Apprentice Maria? 15. If ever Arch. Santos will file a case in court against Apprentice Jose, what should be the case? 16. The architect should always ask the prospective suppliers for MSDS of chemical products they are offering. What is MSDS? 17. Which among the choices should the architect not to consider in his/her relation to the Manufacturer's Suppliers and Dealers? 18. The architect as the author and signatory of the contract can be sued by the client in case of breach and be held by a _____. 19. Under the General Requirements in Specifications, which is not part of the work? 20. Under what division of the master format specification includes Concrete pipes? 21. How many divisions were added to the 16 Division Standard Specifications after 2016? 22. It means the cost of the completed building to the Owner, including the structure, MEFP, all elements attached to the plan and as designed by the architect . 23. This cost includes the cost of construction and all professional fees and permits. 24. In Project Development, all professional fees and permit fees are classified as: 25. Who pays for the professional's insurances during construction of the project? 26. This scientific study allows the architect to focus on the ways in which the building can best maintain itself and prolong its life. 27. Scope of service includes materials and finishes, construction methodologies, building envelopes, roofing systems, fenestrations, hardware, fixtures and fittings. 28. Knowledge in office operations, office management, accounting, finance and taxation are best described in: 29. Recommends the systematic process of ensuring a building’s array of systems is planned, designed, installed and tested to perform according to design intent and building’s operational needs? 30. What government agency implements the provisions of RA 9285?
ANSWERS HERE:
Current state regulations for the registration, licensing, and practice of architecture, the Standards of Professional Practice, and the Code of Ethical Conduct a. Statutes regulating the practice of architecture in the Philippines a.1 Republic Act (R.A.) No. 9266 (The Architecture Act of 2004) and its 2004 implementing rules and regulations (IRR), particularly those focusing on the relationships of the RLAs with the PRB-ARC and of the PRB-ARC with the PRC; a.2 R.A. No. 8981 (The PRC Modernization Act of 2000) and its IRR; and a.3 Professional Regulation Commission (PRC) and Professional Regulatory Board of Architecture (PRB-ARC)
Resolutions related to the Practice of Architecture in the Philippines.
b. Integrated and Accredited Professional Organization of Architects (IAPoA) - The United Architects of the Philippines as the IAPoA;
c. RLA’s Code of Ethical Conduct;
d. RLA’s Credo;
d. Rights and responsibilities of the RLA;
e. Spectrum of architectural services;
e.1 Pre-Design Services
e.2 Design Services
e.3 Specialized Allied Services
e.4 Construction Services
e.5 Post-Construction Service
e.6 Comprehensive Services
e.7 Design-Build Services
f. Architectural fees and charges;
g. Selection of the Architect and Methods of Compensation (including the conduct of architectural competitions); and
h. Global Practice: GATS, APEC Architect, ASEAN Architect, and its Mutual Recognition Agreements (MRAs)
#architecturestudent #architecturestudents #lifeofanarchitect
#boardexam #boardexams #boardexampreparation
#exam
#architecturereview #EnPreview #environmentalplanning
#atlasiseverything
#education
#architecturereview
#discoveratlascdc
#experienceatlascdc
#alereview
#architecture
#architect
#architectural
#architects
#architecturelovers
#AQE
#PUP_AQE
#architecturequalifyingexam
#uapsa
#uapga
#piasa
#jrpia
#asaphil
#architects
#architecturelovers
#AQE
#PUP_AQE
#architecturequalifyingexam
#uapsa #uapga #asaphil #piasa #jrpia


0 comments:
Post a Comment