sample board exam questions for ALE Day 1 AM session on Professional Practice, which includes RA 9266, Code of Ethics, SPP Docs 201-209, General Conditions, Contract Documents, Specifications, Project Scheduling, Global Practice
1. What is the first phase of the Architects Basic Services?
2. In the final submitted construction cost to the owner, who prepares the Bill of Quantities (BOQ)?
3. Who prepares the Bill of Materials (BOM)?
4. The architect may prepare and come up with the Project Construction Cost through the following estimate technique except:
5. What is the suitable estimate technique during the Project definition and Schematic Design Phase of the Project?
6. In RA 9266, it refers to an act or behavior that gravely violates the sentiment or accepted standards of the community?
7. Refers to contracts or arrangements involving the transfer of systematic knowledge for the manufacture of a product.
8. The Architects plans, models and perspectives are called ___.
9. A written statement from the architect confirming the amount of money due to the contractor once work is accomplished.
10. An 8-hour site supervision falls under what Architect's Services?
11. In this selection process, the Architect explains his methodology in translating the plan and design requirements of the proposed project.
12. Which is not a required knowledge for a Consulting Architect in the practice of Architectural Research Methods?
13. Cost based method employed for non-creative works
14. What is the general basis of the Architect’s percentage-based fee?
15. Which of the following is not within the scope of practice of architecture?
16. The selection of the member of the Board of Architecture will start with the submission of a list of five nominees submitted by whom?
17. Who shall accredit the Continuing Professional Development providers?
18. Which of the following is included under Part 1 of a three-part section specification format?
19. Who among the choices cannot issue a construction bond?
20. Type of Specification that identifies the manufacturers name and brand name
21. Which should be avoided in Specifications writing?
22. Three dimensional and computer graphics technology offers both Architects and Client the advantage of:
23. The Architect has chosen a winning bidder but the Owner doesn't approve. What is the architect’s course of action?
24. What must be the character of Architect nowadays?
25. What should a newly passed in Architecture Licensure Examination do after?
26. RA 9266, known as "An act to regulate the practice of Architecture in the Philippines" was signed and sealed on?
27. Which of the following is architect’s responsibilities in relation to the public?
28. Architect-in-charge of Construction is responsible to owner on what matters?
29. This is not a reason for refusal of registration and removal of name from roster of Architects or revocation of license.
30. For contract documents, who is the author of the drawings under the Intellectual property rights law?
ANSWERS HERE:
Current state regulations for the registration, licensing, and practice of architecture, the Standards of Professional Practice, and the Code of Ethical Conduct a. Statutes regulating the practice of architecture in the Philippines a.1 Republic Act (R.A.) No. 9266 (The Architecture Act of 2004) and its 2004 implementing rules and regulations (IRR), particularly those focusing on the relationships of the RLAs with the PRB-ARC and of the PRB-ARC with the PRC; a.2 R.A. No. 8981 (The PRC Modernization Act of 2000) and its IRR; and a.3 Professional Regulation Commission (PRC) and Professional Regulatory Board of Architecture (PRB-ARC)
Resolutions related to the Practice of Architecture in the Philippines.
b. Integrated and Accredited Professional Organization of Architects (IAPoA) - The United Architects of the Philippines as the IAPoA;
c. RLA’s Code of Ethical Conduct;
d. RLA’s Credo;
d. Rights and responsibilities of the RLA;
e. Spectrum of architectural services;
e.1 Pre-Design Services
e.2 Design Services
e.3 Specialized Allied Services
e.4 Construction Services
e.5 Post-Construction Service
e.6 Comprehensive Services
e.7 Design-Build Services
f. Architectural fees and charges;
g. Selection of the Architect and Methods of Compensation (including the conduct of architectural competitions); and
h. Global Practice: GATS, APEC Architect, ASEAN Architect, and its Mutual Recognition Agreements (MRAs)
#architecturestudent #architecturestudents #lifeofanarchitect
#boardexam #boardexams #boardexampreparation
#exam
#architecturereview #EnPreview #environmentalplanning
#atlasiseverything
#education
#architecturereview
#discoveratlascdc
#experienceatlascdc
#alereview
#architecture
#architect
#architectural
#architects
#architecturelovers
#AQE
#PUP_AQE
#architecturequalifyingexam
#uapsa
#uapga
#piasa
#jrpia
#asaphil
#architects
#architecturelovers
#AQE
#PUP_AQE
#architecturequalifyingexam
#uapsa #uapga #asaphil #piasa #jrpia


0 comments:
Post a Comment