sample board exam questions for ALE Day 1 AM session on Professional Practice, which includes RA 9266, Code of Ethics, SPP Docs 201-209, General Conditions, Contract Documents, Specifications, Project Scheduling, Global Practice
1. What is the document or standard form of agreement that defines the scope of work and amount of contract among others in a construction job?
2. What is the document that describes and defines the design, material to be used and the standards of workmanship in construction?
3. The common term for the drawings submitted to the OBO after the completion of project construction is ____.
4. What is the legal provision that shall be incorporated in all contract documents and other instruments of service prepared by all architects?
5. The Invitation to Bid may NOT contain information about _____.
6. The maximum imprisonment as penalty to architect found guilty of malpractice under RA 9266 is ____.
7. The MINIMUM imprisonment as penalty to architect found guilty of malpractice under RA 9266 is ___.
8. What is NOT an architect’s responsibility in relation to the people?
9. What is NOT an architect’s responsibility in relation to the people?
10. What is NOT an architect’s responsibility in relation to the contractor?
11. Deadline on payment of Professional Tax Receipt (PTR) is _____.
12. The most common renewal of business permit is done in the month of ____.
13. The first step in renewal of business license is securing ____ permit.
14. When is the deadline of filing the income tax return?
15. What is the general percentage rate of VAT in the Philippines?
16. In comparative selection, the client selects the architect at what stage?
17. Any set of design drawing made to articulate a design concept is called _____.
18. What are drawings that describe the character of the project as to structural, mechanical, electrical and all other essentials?
19. Who pays the construction supervisor should the owner require during construction?
20. Which method of compensation is flexible and easy to apply relative to size and complexity
21. What is the most common percentage per day of delay, of the contract price, the sum of liquidated damages due to failure of the contractor to complete the project on time?
22. Whenever class of material is specified by trade name or by catalog references, substitution can be allowed with approval of the ___.
23. What is the SPP Document that deals on architects’ specialized services?
24. What is the specific provision of RA9266 stating that architectural interiors is one of the subjects for the Licensure Examination of Architects (LEA)?
25. What is the specific provision of RA9266 stating that architectural Interiors is one of the scope of the practice of architecture?
26. What is the provision of RA9266 that states Structural Design is one of the subjects in LEA?
27. What does NOT apply to Structural Conceptualization with regards to structural elements as defined in RA9266?
28. Once an architect is duly registered, membership to the IAPOA is ____.
29. What is required of agencies or organizations who secure the service of a foreign professional authorized by the law to practice in the Philippines?
30. What is to be executed before any person can require an architect to perform any service, otherwise he/she shall be guilty of misdemeanor?
ANSWERS HERE:
Current state regulations for the registration, licensing, and practice of architecture, the Standards of Professional Practice, and the Code of Ethical Conduct a. Statutes regulating the practice of architecture in the Philippines a.1 Republic Act (R.A.) No. 9266 (The Architecture Act of 2004) and its 2004 implementing rules and regulations (IRR), particularly those focusing on the relationships of the RLAs with the PRB-ARC and of the PRB-ARC with the PRC; a.2 R.A. No. 8981 (The PRC Modernization Act of 2000) and its IRR; and a.3 Professional Regulation Commission (PRC) and Professional Regulatory Board of Architecture (PRB-ARC)
Resolutions related to the Practice of Architecture in the Philippines.
b. Integrated and Accredited Professional Organization of Architects (IAPoA) - The United Architects of the Philippines as the IAPoA;
c. RLA’s Code of Ethical Conduct;
d. RLA’s Credo;
d. Rights and responsibilities of the RLA;
e. Spectrum of architectural services;
e.1 Pre-Design Services
e.2 Design Services
e.3 Specialized Allied Services
e.4 Construction Services
e.5 Post-Construction Service
e.6 Comprehensive Services
e.7 Design-Build Services
f. Architectural fees and charges;
g. Selection of the Architect and Methods of Compensation (including the conduct of architectural competitions); and
h. Global Practice: GATS, APEC Architect, ASEAN Architect, and its Mutual Recognition Agreements (MRAs)
#architecturestudent #architecturestudents #lifeofanarchitect
#boardexam #boardexams #boardexampreparation
#exam
#architecturereview #EnPreview #environmentalplanning
#atlasiseverything
#education
#architecturereview
#discoveratlascdc
#experienceatlascdc
#alereview
#architecture
#architect
#architectural
#architects
#architecturelovers
#AQE
#PUP_AQE
#architecturequalifyingexam
#uapsa
#uapga
#piasa
#jrpia
#asaphil
#architects
#architecturelovers
#AQE
#PUP_AQE
#architecturequalifyingexam
#uapsa #uapga #asaphil #piasa #jrpia


0 comments:
Post a Comment